This package includes the following parts:

EMAG KARSTENSHG 320

| KSS Demand | l/min | ||
| Grinding Burn | |||
| Energy | kWh | ||
| Q´w | mm³/s | ||
| Grinding wheel wear |
| Reduction of coolant | 172 l/min | 130 l/min |
The outlet speed of the coolant was improved by the use of needle nozzles. The sufficient supply of lubricoolant was thus ensured and the previously high rate of waste was minimised. The Return on Investment (ROI) was quickly achieved by avoiding defective components.
* This is an exemplary application. This optimization is application-specific and not necessarily transferable to all machines of this type.
We would be happy to advise you in more detail on your desired topic. Simply send a non-binding inquiry to info@grindaix.de, and we will get back to you as soon as possible.
Der Ablauf einer Maschinenumrüstung
1 Coolant Audit
Analyse der Maschine/n vor Ort (ca. 5h /Maschine) im Produktionsbetrieb. Analyse der Verrohrungen im Maschinenraum – Maschine nur 1 h – offline. Erfassung Ihrer Einspar- und Optimierungspotenziale.
2 Engineering / Zusammenstellung des Umrüstsatzes
Darstellung Ihrer aktuellen KSS-Situation inkl. Potenzialen (€/kWh/[l/min]). Technische Empfehlung der Umbaumaßnahme inkl. Stückliste.
3 Umbau
Einbau des Grindaix Umrüstsatzes in Ihre Werkzeugmaschine inkl. aller mechanischen/mechatronischen Arbeiten CE-Konformität, Dokumentationsänderung, Haftung.
4 Inbetriebnahme
Prüfung Ihrer Verbesserungen im Hinblick auf Produktivität (Taktzeit), Werkzeugstandzeit, Energieverbrauch, KSS-Einsparung (Nachweis).