This package includes the following parts:

needle nozzles
needle nozzles
different needle nozzles (linear)
Pumpe
Pumpe
Pump (grundfos)

SCHAUDTZeus M2

cam shaft grinding
Zeus M2
KSS Demand
l/min
Energy
kWh
Grinding wheel wear
Grinding Burn
Q´w
mm³/s
Reduction of coolant182 l/min131 l/min
Reduction of energy / year26000 kWh7500 kWh
  • Replacement of grinding nozzle and extinguishing nozzle with Grindaix nozzles
    • lubricoolant savings
    • greater process stability
  • New frequency-controlled LP pump suitable for the new maximum flow rate
    • high energy savings
       

* This is an exemplary application. This optimization is application-specific and not necessarily transferable to all machines of this type.

* Required fields

Der Ablauf einer Maschinenumrüstung

1 Coolant Audit

Analyse der Maschine/n vor Ort (ca. 5h /Maschine) im Produktionsbetrieb. Analyse der Verrohrungen im Maschinenraum – Maschine nur 1 h – offline. Erfassung Ihrer Einspar- und Optimierungspotenziale.

2 Engineering / Zusammenstellung des Umrüstsatzes

Darstellung Ihrer aktuellen KSS-Situation inkl. Potenzialen (€/kWh/[l/min]). Technische Empfehlung der Umbaumaßnahme inkl. Stückliste.

3 Umbau

Einbau des Grindaix Umrüstsatzes in Ihre Werkzeugmaschine inkl. aller mechanischen/mechatronischen Arbeiten CE-Konformität, Dokumentationsänderung, Haftung.

4 Inbetriebnahme

Prüfung Ihrer Verbesserungen im Hinblick auf Produktivität (Taktzeit), Werkzeugstandzeit, Energieverbrauch, KSS-Einsparung (Nachweis).